One lane closed at Polemidies roundabout heading to Nicosia due to road collision
A road collision involving four vehicles has closed one lane of the acceleration slip road at Polemidies roundabout heading towards Nicosia. Two vehicles are immobilized on the lane and drivers are urged to exercise caution and follow police instructions.
Newer Updates
Acceleration lane at Polemitia roundabout towards Nicosia reopened to traffic
The acceleration lane from Polemitia roundabout in the direction of Nicosia, which was temporarily closed due to a road collision, has been reopened to traffic. Drivers are urged to exercise caution, drive at low speeds, and maintain distance from other vehicles.
Retaining wall construction works on the Limassol - Troodos road
On the Limassol – Troodos road near Psilo Dendro, a private company will carry out works to construct a retaining wall with an integrated mesh to raise existing walls. During the works, one traffic lane will be closed for approximately 100 m and traffic will be diverted to the adjacent lane using temporary traffic lights.
Water supply pipe installation on the Episkopi-Mandria road
On the Episkopi-Mandria road, near the village of Souni-Zanatzia, a private company will carry out water supply pipe installation works on behalf of the Water Development Department. During the works one traffic lane will be closed for approximately 100 m and traffic will be diverted to the adjacent lane using temporary traffic lights.
Construction of retaining wall on Limassol-Troodos road
On the Limassol – Troodos road near Psilo Dendro, from Monday 24/08/2026 until Wednesday 23/12/2026, a private company will carry out works to construct a retaining wall with an integrated mesh to raise existing walls. During the works, one traffic lane will be closed over a length of approximately 100 m, and traffic will be diverted to the adjacent lane using temporary traffic lights.
Irrigation works on motorway central median
On sections of the motorway in both directions, over a length of 1.5–2 km per day, from Monday 31/08/2026 until Friday 11/09/2026, excluding weekends, from 08:00 to 15:00, periodic irrigation works will be carried out by the Forestry Department on the central median, for a total length of approximately 17.5 kilometres. During the works the right traffic lane will be partially closed and traffic will be diverted to the left lane.
Installation of water pipeline on Episkopi-Mandria road
On the Episkopi-Mandria road near the village of Souni-Zanatzia, a private company, on behalf of the Water Development Department, will carry out works to install a water pipeline. During the works, one traffic lane will be closed for approximately 100 m and traffic will be diverted to the adjacent lane using temporary traffic lights.
Watering works on the central median
On the motorway section between Erimi and Petra tou Romiou, periodic watering works on the central median will be carried out by the Forestry Department. During the works, the right lane of traffic may be closed at any time for a length of approximately 2000 meters, and traffic will be diverted to the left lane.